CAM EXPENDITURE
OPEX BUDGET
EXPENDITURE
FM SERVICES
AMC SERVICES
CONSUMABLES
R&M
MANAGEMENT FEE
TOTAL CAM
GRID POWER / CAPTIVE POWER
GRID POWER | |
---|---|
CMD | 5500 KVA |
RMD | 0 KVA |
ACTIVE POWER | 0 KWH |
APPARENT POWER | 0 KVAH |
POWER FACTOR | 0 COSΘ |
CUMULATIVE KVAH | 0 KVAH |
TARIFF | 9 INR |
UNITS PER SFT | 0 KVAH |
CAPTIVE POWER | |
---|---|
CAPTIVE GENERATION | 0 KWH |
CUMULATIVE KVAH | 0 KVAH |
HSD STOCK | 0 KL |
HMWSSB WATER / RECYCLED WATER
HMWSSB WATER | |
---|---|
SANCTION DEMAND | 350 KLD |
DAY CONSUMPTION | 0 KL |
CUMULATIVE | 0 KL |
RECYCLED WATER | |
---|---|
WATER RECYCLED | 0 KL |
CT CONSUMPTION | 0 KL |
FLUSH CONSUMPTION | 0 KL |
HORTICULTURE | 0 KL |
COST PER KL | 0 INR |
INFRASTRUCTURE
INFRASTRUCTURE | UPTIME |
---|---|
TRANSFORMERS | |
DIESEL GENERATORS | |
UPS | |
WC CHILLERS | |
AC CHILLERS | |
COOLIONG TOWERS |
INFRASTRUCTURE | UPTIME |
---|---|
VENTILATION FANS | |
PASSENGER LIFTS | |
SERVICE LIFTTS | |
BMS | |
FAS & PA | |
STP |
Repair and Maintenance
52 Week PPM
Scheduled
Completed
Pending
Finance / Metrics
10000/-
Capex
5000/-
Opex
12.6/-
Cost/sq.ft
3.5 Units/ltr
DG Efficiency rate
6.15 /Ltr
EB Unit rate
162 /KL
Water Unit rate
61.38 /Ltr
HSD Unit rate
20.33
DG Unit rate
4.89 /Unit
BTU rate