Loading Please Wait......
HoToSheet MepServices
Name of the Service provider
Date
HO:Handover
Designation:
SHIFT TIMINGS:
TO:Takenover
Designation:
SHIFT TIMINGS:
Manpower Summary
Vendors & OEM
WaterTankslevels
Remarks
Shift Engineer
Description
No.of Attendes
Name of the Company
Z1 FIRE TANK_165KL
MST
AMC- OEM
Z2 FIRE TANK_160KL
HVAC TECH
R&M
RAIN TANK_110KL
Plumber
DLP
RAW TANK_270KL
Carpenter
Others
RAW TANK_110KL
Painter
If any Trainings
TREATED TANK 1_180KL
Helper
TREATED TANK 2_320KL
Fire Technician
FINAL TANK_420KL
BMS Operator
FINAL TANK_420KL
OTIS Tech
FIRE TANK_23KL
STP Operator
DOMESTIC 1_61KL
DOMESTIC 2_30KL
DOMESTIC 3_30KL
HVAC TANK_30KL
FIRE TANK_23KL
DOMESTIC 1_61KL
DOMESTIC 2_23KL
DOMESTIC 3_30KL
HVAC TANK_30KL
HD Complaints
Open
Closed
In Progress&Hold
Remarks
Power Failure Status
PowerFailureTime
Power Restored Time
Hours
Remarks
DG DAY TANK DATA
Diesel Stock
DG-1_990L
UG TANK 1_40KL
DG-1_990L
UG TANK 2_40KL
DG-1_990L
MASTER TANK_800L
DG-1_990L
SPILL TANK_800L
DG-1_990L
DG-1_990L
DG-1_990L
DG-1_990L
DG-1_990L
Equipments Health Status
Equipment
Status
Remarks
Equipment
Status
Remarks
Water cooled Chiller 1200 TR_3nos
WTP-01_20KLD
Water cooled Chiller 600 TR_2nos
WTP-02_20KLD
COOLING TOWERS 1200TR_3nos
DOMESTIC WATER TRANSFOR PUMPS 15HP_ZONE01
COOLING TOWERS 600TR_2nos
DOMESTIC WATER TRANSFOR PUMPS 15HP_ZONE02
PRIMARY PUMPS 60HP_3nos
HNS PUMPS HIGH ZONE 5.5KW
PRIMARY PUMPS 30HP_2nos
HNS PUMPS LOW ZONE 4KW
CONDENSOR PUMPS 180HP_3nos
PCC PANELS_4nos
CONDENSOR PUMPS 100HP_2nos
3D TRASAR
SECONDARAY PUMPS 100HP_3nos
DG SYNCHRONIZATION PANELS
SECONDARAY PUMPS 40HP_2nos
DG SETS 2250KVA_7nos
CHILLER PLANT MANAGER_CPM
DG SETS 1250KVA_2nos
LT TRANSFORMERS 2.5MVA_8nos
WATER BODIES_5nos
HT TRANSFORMERS 10MVA_2nos
STP PLANT_600KLD
BMS SYSTEM
PASSENGER ELEVATORS_32nos
UPS 80KVA_3nos
SERVICE ELEVATORS & PH LIFT_05nos
UPS 30KVA_2nos
ESCALATORS_04nos
Equipment Breakdown
Incidents/ Accidents/ Any Machine Breakdowns
Operations Highlights
Follow Ups
HoToSheet MepServices
Name of the Service provider
1003
Date
1003
HO:Handover
Floor Cleaning
Designation:
Floor Cleaning
SHIFT TIMINGS:
Floor Cleaning
TO:Takenover
Floor Cleaning
Designation:
Floor Cleaning
SHIFT TIMINGS:
Floor Cleaning
Manpower Summary
Vendors & OEM
WaterTankslevels
Remarks
BMS
Floor Cleaning
Description
No.of Attendes
Name of the Company
UG Fire tank -1 (200 KL)
27-Sep-2021 10:34PM
Supervior
27-Sep-2021 10:34PM
AMC- OEM
27-Sep-2021 10:34PM
27-Sep-2021 10:34PM
UG Fire tank -2 (200 KL)
27-Sep-2021 10:34PM
Electrician
27-Sep-2021 10:34PM
R&M
27-Sep-2021 10:34PM
27-Sep-2021 10:34PM
UG ManjeeraTank -(116 KL)
27-Sep-2021 10:34PM
Plumber
Pending
DLP
Pending
Pending
UG Raw Tank-(146 KL)
Pending
Carpenter
Pending
Others
Pending
Pending
OH Flush water tank (49 KL)
Pending
Painter
Pending
If any Trainings
Pending
Pending
OH Domestic Tank (49 KL)
Pending
Hvac
Pending
OH M Domestic Tank (39 KL)
Pending
Fire Technician
Pending
OH Makeup Tank (39 KL)
Pending
OH Fire watertank (25 KL)
Pending
Complaints
Open
Closed
In Progress&Hold
Remarks
TSSPDCL(EB)-Status
Hours
Pending
Pending
Pending
Pending
PowerFailureTime
Pending
Power Restored Time
Pending
Diesel Stock
DG-1
DG-2
DG-3
DG-4
Reserved tank
Remarks
Pending
Pending
Pending
Pending
Pending
Equipments Health Status
Equipment
Status
Remarks
Equipment
Status
Remarks
Air cooled Chiller-1 300 TR
Pending
Domestic Pumps
Pending
Air cooled Chiller-2 300 TR
Pending
WTP Pumps
Pending
Water cooled Chiller-1 600 TR
Pending
Passenger Elevators (8-No's)
Pending
Water cooled Chiller-2 600 TR
Pending
Service Elevators (2-No's)
Pending
UPS 40 KVA
Pending
Chiller Mack up pump
Pending
24V/40A Battery charger
Pending
STP Plant
Pending
Jockey pump
Pending
CCTV
Pending
Hydrant Pump
Pending
Transformers - 1 &2
Sprinkler Pump
Pending
DG Set's
Pending
Diesel Engine
Pending
FAPA
Pending
Booster Pump
Pending
Fountain's
Pending
Equipment Brakedown
Incidents/ Accidents/ Any Machine Breakdowns
Operations Highlights
Follow Ups
HOTO SHEET SOFT SERVICES
Name of the Service provider
1003
Date
HO:Handover
Floor Cleaning
Designation:
Floor Cleaning
SHIFT TIMINGS:
Floor Cleaning
TO:Takenover
Floor Cleaning
Designation:
Floor Cleaning
SHIFT TIMINGS:
Floor Cleaning
Manpower Summary
Vendors & OEM
Chemical Consumption
Remarks
Supervior:
Floor Cleaning
Description:
No.of Attendes
Name of the Company
R1
27-Sep-2021 10:34PM
HK Boys
27-Sep-2021 10:34PM
AMC- OEM
27-Sep-2021 10:34PM
27-Sep-2021 10:34PM
R2
27-Sep-2021 10:34PM
HK Maids
27-Sep-2021 10:34PM
R&M
27-Sep-2021 10:34PM
27-Sep-2021 10:34PM
R3
27-Sep-2021 10:34PM
Pest Control
27-Sep-2021 10:34PM
DLP
27-Sep-2021 10:34PM
27-Sep-2021 10:34PM
R4
27-Sep-2021 10:34PM
Horticluture
27-Sep-2021 10:34PM
Others
27-Sep-2021 10:34PM
27-Sep-2021 10:34PM
R5
27-Sep-2021 10:34PM
Others
27-Sep-2021 10:34PM
If any Trainings
27-Sep-2021 10:34PM
27-Sep-2021 10:34PM
R6
27-Sep-2021 10:34PM
D7
27-Sep-2021 10:34PM
Nose Mask
27-Sep-2021 10:34PM
Hand Sanitiozer /Hand Wash
27-Sep-2021 10:34PM
27-Sep-2021 10:34PM
Air freshner/ Aroma
27-Sep-2021 10:34PM
Small/ Big Garbage Covers
27-Sep-2021 10:34PM
Others
27-Sep-2021 10:34PM
Complaints
Open
Closed
In Progress&Hold
Remarks
Pending
Pending
Pending
Pending
Equipments Health Status
Garbadge Status
Equipment
Qty
Status
Remarks
Hand Scrubbing Machine
Pending
Pending
Pending
Wet Garbadge (kg)
Pending
Jet pressure Machine
Pending
Pending
Dry Garbadge (kg)
Pending
Taski ergodisk machine
Pending
Pending
Others
Pending
Taski wet dry vacum machine
Pending
Pending
Garbadge Room Status
Pending
FLEPPER MACHINES
Pending
Pending
Others
Pending
Equipment Brakedown
Incidents/ Accidents/ Any Machine Breakdowns
Operations Highlights
Follow Ups