HoToSheet MepServices
Name of the Service provider
Date
HO:Handover
Designation:
SHIFT TIMINGS:
TO:Takenover
Designation:
SHIFT TIMINGS:
Manpower Summary
Vendors & OEM
WaterTankslevels
Remarks
BMS
Description
No.of Attendes
Name of the Company
UG Fire tank -1 (200 KL)
Supervior
AMC- OEM
UG Fire tank -2 (200 KL)
Electrician
R&M
UG ManjeeraTank -(116 KL)
Plumber
DLP
UG Raw Tank-(146 KL)
Carpenter
Others
OH Flush water tank (49 KL)
Painter
If any Trainings
OH Domestic Tank (49 KL)
Hvac
OH M Domestic Tank (39 KL)
Fire Technician
OH Makeup Tank (39 KL)
OH Fire watertank (25 KL)
Complaints
Open
Closed
In Progress&Hold
Remarks
TSSPDCL(EB)-Status
Hours
PowerFailureTime
Power Restored Time
Diesel Stock
DG-1
DG-2
DG-3
DG-4
Reserved tank
Remarks
Equipments Health Status
Equipment
Status
Remarks
Equipment
Status
Remarks
Air cooled Chiller-1 300 TR
Domestic Pumps
Air cooled Chiller-2 300 TR
WTP Pumps
Water cooled Chiller-1 600 TR
Passenger Elevators (8-No's)
Water cooled Chiller-2 600 TR
Service Elevators (2-No's)
UPS 40 KVA
Chiller Mack up pump
24V/40A Battery charger
STP Plant
Jockey pump
CCTV
Hydrant Pump
Transformers - 1 &2
Sprinkler Pump
DG Set's
Diesel Engine
FAPA
Booster Pump
Fountain's
Equipment Breakdown
Incidents/ Accidents/ Any Machine Breakdowns
Operations Highlights
Follow Ups